Contact us: +49 9321 2680 -201

PRODUCT DETAILS

SCADA Main Unit

SCADA Main Unit Data Management

Data Management

for global monitoring and management of PV plants
  • Powerful IPC with PADCON PV Real Time Software
  • Data collection & processing on site
  • Long-term data archiving on site
  • High security due to encrypted VPN
  • Expandable with intelligent additional functions

Technical Data

Housing

Installation

Outdoor / Indoor

UV resistance

Yes

Material

Fiberglass reinforced polycarbonate

Fire properties

Self-extinguishing and halogen-free

Colour scheme

RAL 7035

Mounting

Ground

Dimensions & Weight

Housing (width/height/depth)

Max. 1300/1200/300mm (depending on configuration)

Weight

Max. 100kg (depending on configuration)

Input parameters

Cable fitting

M25

Suppy voltage

190V-270V, 50Hz/60Hz

Power input

300W max.

Communication

Plant network

Connection of up to 8 data loggers per IPC, e.g. 8 PADCON Sensor Boxes via ethernet

Functionality

Industrial PC

Fanless Design, Rich Onboard I/O and Expansion Slots (1 x PCI, 1 x Mini-card), Support Various Video Interfaces (Analog RGB, DVI, DisplayPort, TV-out), Rugged Design for Shock/Vibration Protection, Intel® SSD Compatible

Software

PV-Realtime

Switch

8 port Managed Industrial Switch

Standards

CE

Conform

UL-508A

UL listed

Protection class and ambient conditions

Protection class in accordance with EN60529

IP 54

Permissible ambient temperature

-20 °C to +38 °C

Rel. humidity non-condensing

15% to 95%

Height above sea level

2000 m

Optional

Heating / Ventilation

Temperature controlled

Internet

Internet connectivity via GPRS/EDGE/UMTS, DSL, LTE or Ethernet

Fiber optic connection

Connection to plant network via network adapter

DSL connection type

Annex A or B (DSL version)

Outside aerial

GPRS/EDGE/UMTS/LTE unidirectional or omnidirectional (UMTS version)

VPN

VPN/IPSec

Internal sensors

Temperature, Athmospheric humidity

Monitoring function

Alarm for voltage drop, Voltages loss, Termperature, door contact, atmospheric humidity, Notification by email, Nagios® may be integrated

USV

Bypass time for voltage drop approx. 60 min

Connection monitoring

Automatic reset on connection disturbance

Remote access

Components can be configured via external connection

Surge protection

Typ 2

Accessories

Base

Second IPC

Connection of up to 16 data loggers per IPC, e.g. 16 PADCON Sensor Boxes

Network monitoring

Watchdog timer with automatic reset function

  • Technical Data
  • Download